Originally Posted by
GraphiteGhost
07's in the south will (should) be done first, then the next declared risk factor, then the 08's in the south, then the rest in the zones that are listed for the risks involved due to extreme heat/humidity. I sure hope mine gets done soon as well. Light at the end of the tunnel? In my opinion, FCA should have made this possible long before now for the ones that have been declared most likely to fail catastrophically.
.
You should have complained some.