Busy day tomorrow
Will be installing new drilled/slotted rotors, new rotex gold pads, goodridge stainless steel brake lines. Will also be flushing the brake system, adding DOT5 fluid, installing the B&M line lock and painting the calipers. Also my new intake from JMB Performance came in and will be doing the final install of it as well. Had to drill and tap for the nitrous nozzle and wait for the K&N filters to arrive. And while i have it on the lift i will be installing the steering stabilizer, changing the screws on my rims to stainless steel and cleaning the rims. And to round out the day, i figured i would mock up the new exhaust system, weld the tabs for it and get it ready for powder coating.
**Forgot about the royal purple oil change
Hopefully, by next weekend, i will have the valve covers, "Y" pipe, air boxes and heat shields removed so i can send them out for powder coating as well. While the car is down and waiting for parts to be returned, i am hopefully gonna have the new hood scoop installed.
GOTTA LOVE WEEKENDS!
Last edited by MUTT; Aug 16, 2008 at 04:38 AM.