Originally Posted by GDrag
So how long did it take you Zahanma?
About an 1hr15min to 1hr30min to do the install, plus about 5min to mix up the different solutions. That was for just the two front windows though. I will be putting on the back side windows tonight and maybe the rear hatch windows as well depending on time. The rear hatch will be an adventure with the defroster lines in it... So we will see how that goes.