Originally Posted by jmswllms
I think very little improvement.
The point is that in the future there will not be enough used SRT6 carriers to replace the broken ones.
New is very expensive.
Hmmmm.... I would think that a 327 would cut at least a tenth off the 60' times, and there would still be more than enough power to pull through the 1/4. I could be totally off base here, but I would think a 327 would cut 2-3 tenths off the 1/4 time. Does this sound wrong?