P1010138.JPG
P1010139.JPGThis is as far as I got today. I'll work on fabbing the rubber floor tomorrow if I can find time between Honeydo's. I figured, why not just use the stock battery hold down. I just drilled the tack weld out (I know I said no new holes) but it's just (2) 1/4"holes in the batt. base that will be covered with the rubber floor, never to be seen again. Rob's spacer had to be slightly modified (1/4"cut off the negative end and holes to receive the red cap redrilled 3/8" back towards negative side) I'll check for terminal clearances, new length for ground cable, etc., tomorrow also, maybe. Honestly; it's not going anywhere just like that, but I want a rubber floor dang it! I guess depends on what size tank will go there. Might need the extra 3/4" perhaps; we'll see. Edit: That Silly Ricer looking/superhero decal on our Shurikens has got to go!