Old Jun 29, 2013 | 06:57 AM
  #31 (permalink)  
waldig's Avatar
waldig
Senior Member
Joined: Feb 2008
Posts: 4,508
Likes: 34
From: VA
Talking Re: Hot water testing of the parallel and stock IC.

Mine is on the floor with many other projects, 1930 zenith restoration in process, all planes are grounded, work on dual T/B at a pause, and pump of course. House to be done by august, I have to finish doing the 30 x 66 garage and the heat is really slowing down this 66 yr old dude. working in the rain is a blessing round here. WW
 
Reply