Originally Posted by HDDP
Once you build the proto and have the jig cut, the price of material is a mere $120 (retail) The problem is do you want long tube, or short tube and do they need to pass smog with the secondary 02 bungs attached...
Shorties - and I'll relocate the O2 sensors just below the flange.