I need to make a shifter boot and finish my intake plumbing. Then I can finally crank it for the first time. I have a 3 foot straight piece of pipe ordered. Gauges are electroluminescent. There was plenty of room for the FMIC. I think I am going to mount the air filter and maf in the area behind the fog lights.
IMG_0176.jpg
IMG_0174.jpg
IMG_0173.jpg
IMG_0170.jpg