Doing some mods tonight.
OK OK, enough is enough. I have had some mods lying around since last fall and I am finally going to start on them tonight. Tonight I hope to install the NW DCAI, Fluid Isolation kit and the NW Catch Can. I also have a leaking valve cover so I plan on doing that at the same time.
This weekend I hope to accomplish the new exhaust down pipes and the pulley kit.
I have the instructions provided by Rob at NeedsWings so I hope all goes smooth. Does anyone have an idea of how long the installation of the CAI, CC, IK and the new valve cover seals should take me? I have limited space in my barn (it is over crowded with toys) so I do not want this project to get out of hand on me and block my access to my other vehicles. Can I do this in one evening?
Gary